Are you looking for:
The On Corridor Works project is the largest capital infrastructure project in the Province’s historic GO Rail Expansion program. On Corridor work includes all works that facilitate train service, such as track, civil infrastructure, signalling, electrification infrastructure and electric vehicles, as well as the operations and maintenance of the GO rail network.
GO Rail Expansion will transform the transportation network in the Greater Toronto and Hamilton Area over the next decade. Metrolinx will transform the GO Transit rail network into a system that will deliver two-way, all-day service every 15 minutes over core segments of the GO Rail network. System-wide infrastructure upgrades will include: adding tracks, expanding stations, electrification of the rail network, new locomotives and train control systems to enable more frequent service.
The scope of work includes:
These project documents are being made available on this website for informational purposes only. Neither Infrastructure Ontario nor Metrolinx makes any representation or warranty regarding the accuracy or completeness of the content or form of these documents.
Infrastructure Ontario and Metrolinx, in their sole and absolute discretion, may choose to make available on this website amendments, revisions, modifications or replacements to these documents. These documents remain open for further revision, modification, replacement or cancellation by Infrastructure Ontario and Metrolinx at any time and in no event shall either Infrastructure Ontario or Metrolinx be responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use of or reliance on the content of these documents.